NOTICE: TITANCE.COM WILL BE DOWN FOR SCHEDULED MAINTENANCE BEGINNING AT 2:00AM ET ON MONDAY, MAY 9TH.
TCE logo
Become a Content Provider FAQ Contact Us Home
ACCOUNT LOGIN:  User Name:    Password:   
NEW USERS: Forgot your username or password?
Online Courses
Contractors/Trades
Architects
Engineers

Home Study Course Books
Contractors/Trades
Architects
Engineers

Live Webinars
Architects
Engineers

Live Seminars
Contractors/Trades
Architects
Engineers
If you have any questions please call a Titan Representative
1-800-960-8858

 
Drier by Design - Designing to Keep Water Out (5 credit hours/5 HSW Hours)
With erosion paths cut into solid rock as solid evidence, water in various forms contains immense power to eat away or destroy whatever is in its path. Whether it takes a year, two hundred or ten thousand, without intervention, water can and will destroy our man-made structures. Once a problem develops that opens a pathway for intrusion, one rainy season can render a building unsuitable for human use.   

We have the knowledge and tools to combat such destruction of our structures. We implement counterattacks in the design stage, during construction, and afterwards with proactive maintenance. But the battle against water begins in the design phase.   

Moisture resistance principles and methods are discussed in a systematic fashion, as in one building system at a time. Fundamentals are first covered including basic principles of water behavior, and the multiple paths it takes while invading buildings. A thorough knowledge of how destruction begins and escalates, drives the known design principles and material decisions used to stop such migration. Then practical solutions are discussed in detail.   

The discussion is needed. The physical price tag for both our structures and their occupants, is too high to allow water free entry into our occupied spaces.
Paul Spite
A basic understanding of how water moves, migrates, and behaves   

Typical sources of excess moisture in our built environments   

Proactive prevention of unwanted moisture through planning and design  

Methods used during construction to prevent the intrusion of water   

Post-construction prevention of leakage by building envelope inspection  

Common points of failure through which water can gain entrance   

Prevention of water intrusion through control of condensation

Titan Continuing Education, Inc. | 1519 Dale Mabry Hwy, Ste 201 Lutz, FL 33548 | Toll Free: 800.960.8858 | Email: info@TitanCE.com .